There has been lots of work going on around here: scraping ceilings, retexturing, removing ceiling fans, rewiring electrical, painting, laying and refinishing floors, installing a laundry cabinet, changing out a bathroom window, and more. The living room is nearly done now, and the downstairs bedroom is well on its way. Here are some pictures of the work in progress…
I wish these pictures did justice to what terrible condition the dining room ceiling was in… but here’s a sample.
…and currently… still a work in progress, but getting there.
Family Room
Living Room
Master Bedroom
Time to fix up the bathrooms… with leaking toilets and cracked tiled walls, rot, broken cabinets, chipped sinks, holes in the flooring, and termite damage, there wasn’t much to save… so Isaac tore out two of our bathrooms (we’re keeping one functional for now)…
… and we’re trying to put them back together… plumbing and tiling in progress!
2 comments:
The bathroom tile looks great! Wish we could have helped more.
They are looking so great' so close to done!
Post a Comment